Wednesday, July 7, 2010

Oh Great

Please note that for tomorrow and Friday (8/7 and 9/7), both Yah Li and myself will be available to run through with all of you, individually, on the following,

final model materials
final board layout and materials to include
part models (if any)
packaging of information

Please note and the consultation will be scheduled at level 6 studio and attendance is compulsory for both days.

I have appointment in the afternoon which means I'll be skipping consultation tomorrow. On Friday, I'll be consulting Paul the report draft in the morning at 9am. After that, what do I do from 12pm to 3pm? I'm making model at home other than that, I can't do board for it will be a waste of time as I prefer doing model first in case I do not have enough time to render perspectives, I can use my model pictures. I need to think of some things to do during that 3 hours. Maybe I just tell them what I've bought for my model making, then a sketch layout of my storyboard. LOL. What's the point. LOL LOL LOL -.-"

Since it is compulsory, I'll be the first to consult. Once done, I'll head home to do work. Meanwhile as I am free between 12pm to 3pm, I can do my Colour&Light report. Yes! That shall be the plan. Alright! Back to my journal. I left 5% and I'm done. Anyway, I've passed the time I've set previously! So disappointing! Its like 5+hours over schedule. -.-" Oh great...

No comments:

Post a Comment